Center Pivot Irrigation System (Canyon CD)
Project Overview
Basics
Center Pivot Irrigation System (Canyon CD)
Deferred
This project consists of installing a pump, mainline, and center pivot to replace the current gravity (ditch and siphon tube) irrigation system. The project will cover
approximately 60 acres. Runoff from the fields in question is presently running into the Boise River. This project if installed has a direct impact on the Boise River and the TMDL.
The district plans to contribute $1,500.00 for planning and engineering costs. The funding would be 50% state cost share and 50% private landowner cost share. Total estimated cost is $94,500.
approximately 60 acres. Runoff from the fields in question is presently running into the Boise River. This project if installed has a direct impact on the Boise River and the TMDL.
The district plans to contribute $1,500.00 for planning and engineering costs. The funding would be 50% state cost share and 50% private landowner cost share. Total estimated cost is $94,500.
FY2014
FY2014
FY2015
8/20/2019
Location
Organizations
| Conservation District | |
| Funders | |
| Lead Implementer | |
| Partner |
Contacts
Jon Beals (jon.beals@swc.idaho.gov)
Performance Measures
Expected Performance Measures
Reported Performance Measures
No annual Performance Measure accomplishments entered for this Project.
Engineering and Technical Assistance
No technical assistance requests for this Project.
Financials
Budget
| Comment: | None provided |
|---|
Reported Expenditures
No Expenditures have been reported for this Project.
| Note: | None provided |
|---|
Project Themes
Project Themes
Project Details
Attachments
Documents
Documents of any type that are related to your project
No attachments associated with the 'Documents' Attachment Type.
Data Sets
Data Sets in an Excel format that are related to your project
No attachments associated with the 'Data Sets' Attachment Type.
Notes
No Notes entered.
External Links
No External Links entered.
Photos
Photos
No Photos available.